Recent Projects

Cathedral

Our client needed to undertake maintenance on a cathedral, where access had previously been impossible due to:

  • Stairs had to be negotiated to obtain access to the area
  • Restricted access due to the door width
  • Weight limit on the floor was restricted
  • Conventional equipment did not provide for the working height required or the other restrictions in place.

We recommended the Monitor 2210 spider, which has unrestricted outreach, hydraulically expanding tracks that expand width ways and extend down for improved ground clearance.
The huge fly boom provided unmatched up and over outreach, while the large platform could rotate both ways, a full 90 degrees.
Our client was extremely pleased with the solution.

123 Albert St Brisbane

For its project, 123 Albert St Brisbane, Lainge O’Rourke requested that we engineer an access solution that would enable them to clad the full exterior of their 26 floor, premium office and retail mix building.

As the largest single climber job we have ever undertaken, HiReach supplied 20 mast climbers, offering reach up to 120 meters each. While there were many access challenges on this project, we overcame them with minimal disruption and the project was delivered on time and on budget.

 

Yeerongpilly Railway Station

At the Yeerongpilly railway station refurbishment, HiReach engineered an innovative access solution utilising both conventional and specialised access equipment.

Working to a very strict time table (as the lines had to be energised and the rail system completely shut down), we supplied the Monitor 2210 spider to gain platform access. Conventional equipment was ruled out as too heavy and bulky for this application.

On the uneven ground of the railway lines, we supplied the JLG 510 AJ boom lift, which easily provided the necessary ground clearance and robustness to cope with the rough terrain.